The 20 Key Things You Must Know To Measure A Replacement Door

By: Dave Blakeman Home | Business


There are lots of methods of surveying doors. I have listed some of the methods and procedures that I have used to survey and to train surveyors to be able to carry out a door survey successfully.

Hopefully if you are struggling with the survey side of things you may pick up some handy pointers from this article

The surveyor's role is as follows:-

a) To clarify the sales contract and the customer's expectations and design and measure the door accordingly, to fit the purpose and application of the door product.

b) To obtain customer confirmation of any details where the customer can exercise choice.

c) To clarify any contractual issues with the customer.

d) To ensure all surveyed product designs will conform to statutory requirements.

e) To document concise information to allow the manufacturing and installation process to be undertaken successfully and efficiently.

f) To prepare a schedule of all consumable materials and architraves required to complete a successful installation

Firstly, make sure you are product trained and have all the relevant technical data, don't guess - it is costly if you get it wrong.

The survey is relatively simple process provided you have all the technical data from the door manufacturer you use

Technical Information required:-

1. Outer frame colours (internal and external)

2. Slab colours slabs or panel colours (internal and external) remembering some manufacturers only manufacture slab colours outside white inside on certain designs.

3. Maximum and minimum manufacturing parameters.

4. Door and side screen slab or panel designs.

5. Applicable glass designs for the specific slabs or panels.

6. Applicable pattern backing glass available.

7. Outer frame sizes.

8. Compatible outer frame packers or add on sizes.

9. Hinge types and colours.

10. Hinge clearances.

11. External cill sizes (depths and heights)

12. Available threshold options sizes and heights and colours.

13. Coupling jointer types available and sizes.

14. Door Knocker designs and colours available.

15. Kicker plate options and colours.

16. Weather drip options and colours.

17. Available door lock options.

18. Door handle options and colours.

19. Letter plates, door knocker designs and colours.

20. Slab or panel Core construction including raised moulding sizes.

Before you measure anything:-

1. Take photographs of the existing door recording any existing structural or cosmetic damage external & internal before you take any measurements

2. Always view from outside and draw your survey viewed from outside before you take any measurements

3. Record the opening in or out of the door before you take any measurements

4. Record the handing of the door hinged left or right before you take any measurements

The measuring process:-


1. Check the cill for level and allow for out of level situations in the height to be able to level up the new door and cill

Survey errors occur here when the new cill packed up level and the door is then to tall for the opening or the door leaf is to tight to the internal head.


2. Check both reveals in and out for plumb.

Openings can be totally out of plumb on opposite reveals not allowing the frame to be fitted in wind leaving different reveal margins externally and internally, or not allowing the door sash to close in wind with the outer frame.

3. Take 3 width measurements top, middle and bottom internal and external using the narrowest size to determine the width.

You need to take the narrowest size remembering that if the frame is fitted between brick reveals you will need to allow a 10mm clearance for any frame expansion.

4. Take 3 height measurements left, centre and right internal and external using the narrowest size to determine the width

Again you need to take the shortest size remembering that if the frame is fitted between a lintel and dpc, you will need to allow a 10mm gap at the head for any frame expansion. 5. Take the diagonals to check the square of the opening.

This will determine any additional deductions you may need to make to allow the frame to be fitted plumb and square between brick reveals plus any expansion deductions.

6. Check and measure and plaster thickness differences between internal and external widths and the head.

This is common survey error when not checked and hinges get buried behind plaster lines or door leafs are behind plaster lines on the reveals or head. Heavy plaster thicknesses could necessitate the requirement of frame packers or add ons to give hinge or door leaf clearances.

7. Check and measure any dado rails or skirting thicknesses and positions.

Again a common error where thick skirting or dado rails will foul the hinges or door leaf and could necessitate the requirement of frame extensions or add/clip ons to give hinge or door leaf clearances.

8. Check and measure the floor level in relation to the external cill level. Low thresholds should have a 10mm floor clearance.

Probably, the most common survey error especially when low pvc or low aluminium thresholds are used and the bottom of the door leaf will not clear the internal finished floor.

9. Check the existing frame thickness and its position in relation to any cavities and dpc's.

Remove existing architraves to check if necessary. If the frame is to be tucked behind any render check that it can be fitted into a cavity one side and then shuffled back into the opposite cavity and you have enough clearance with the frame entering the reveals at an angle. You may need to call up any external cills with horn additions separately to the frame to do this ensuring existing building finishes are not compromised.

10. Check on positions and of any power cables, telephone cables, alarm cables, door bell cables etc.

Telephone and door bell cables may need to be repositioned or notched around. Power cables may need to be disconnected for safety reasons. A quite common oversight is that alarm sensors should be re fitted by qualified alarm specialists or the customers insurance could be null and void if it failed after being worked on by unqualified persons.

11. Ensure you have complied with approved document N: Glazing - materials and protection in particular BS 6206 (shaded areas showing requirements for safety glass). Also note any energy rated glass that may be required.

Surveyors sometimes miss the safety glass on adjoining windows.


12 Check the existence of any restrictions limiting the installation of PVC-U replacement frames should be checked, especially for listed buildings and / or buildings with special architectural or historic interest.

This can become very costly and sometimes only comes to light after installation and reinstatement of timber frames is required.

13. Undertake a safety risk assessment of the proposed installation.

Record any restricted access, asbestos, height and access equipment, customer property protection, gas pipes electricity cables etc. The surveyor can be held legally responsible in the event of an accident.


A signed survey product confirmation should be obtained and contain all of the following:-

* Confirmation that it is not a listed property or has any restrictions imposed.

* Methods of payment and collection of payment

* Do not leave site until you are 100% confident that you have acquired all the relevant information to achieve a successful manufacture and installation of the product surveyed.

Missing even a single item on the lists above could prove expensive, so take your time!




Article Source: http://www.eArticlesOnline.com

About the Author:
Dave Blakeman is Managing Director of RPS RoofWright, developers of the World's Favorite Conservatory Design Software, and FrameWright - a revolutionary approach to window and door sales.

For a FREE-for-life copy of our professional window and door sales software visit www.freewindowsoftware.com

Tags: , , , ,

Please Rate this Article

 

Not yet Rated

Click the XML Icon Above to Receive Business Articles Via RSS!

Recent Related Articles From Business

  • Swimwear For Pool Party Etiquette
    By: Harris Symonds | May 2nd 2012
    This is the season and here in the South of Spain we will be reaching an average temperature of around 30c in the coming month. This means it is time to plan the first pool party to kick off Bikini Season. Read

  • You Can Succeed With Your Small Business By Doing The Following
    By: Jason Drohn | May 2nd 2012
    Earning money to support your daily needs is something that the current state of our economy is not providing forcing many to seek alternative sources of revenue. Running your own business is actually not as easy as it would seem. Read

  • Give Your Castors An Mot To Survive The Winter
    By: Marcia Dale | May 2nd 2012
    This time last year we were all knee deep in snow wondering when the arctic conditions were going to thaw. This year in order to be prepared for any unexpected wintery conditions many Highway Agencies are maintaining, servicing and replacing castors and equipment with castors in order to be ready to face whatever the weathe ... Read

  • Glass Art Lebanon : Giving Your Home An Ultimate Look
    By: Fadi Junblat. | May 2nd 2012
    The popularity of modern glass art Lebanon has increased manifold since its emergence. The glass artists have become quite experimental in their approach. Read

  • Where To Get A Golf Trophy
    By: Vikram Kumar | May 2nd 2012
    With golf season coming up upon us soon, it’s time for companies to think about getting a golf trophy for those golf outings that they will be hosting. Read

  • Why Get Fantasy Sports Trophies?
    By: Vikram Kumar | May 2nd 2012
    Why should you get fantasy sports trophies? One of the reasons to get them is to add some zing to your fantasy sports team. Read

  • How To Use Free Advertise Online Approach To Find A Great Bargain?
    By: James Adam | May 2nd 2012
    The free advertise online method is one of the cutting-edge techniques, which you may utilize to boost your online marketing efforts. Your organization’s online presentation is as important for you as your actual physical location or the appearance of your sales staff on any business call. Read

  • Where To Get A Fantasy Basketball Trophy
    By: Vikram Kumar | May 2nd 2012
    One way that you can really make a difference with your fantasy sports league is to offer a fantasy basketball trophy to the winner. Read

  • Emergency Medical Services (ems) 5.11 Tactical Gear Part I
    By: Rangemastertacticalgear | May 2nd 2012
    Range Master Tactical Gear provides wide range of 5.11 Tactical, Special Ops Gear, Duty Gear, clothing. We also offer Police Equipment such as Surefire Flashlights, Benchmade Knives, Kershaw Knives at very reasonable prices throughout USA . Read

  • How To Choose A Company For Cnc Precision Engineering
    By: Richard Parkinson | May 2nd 2012
    Deciding on a company for your CNC precision engineering needs can be a confusing task, but it can be made easier by making sure that the company you’re looking at are experienced and offer their services in a wide variety of fields. They should be able to handle their jobs in-house too. Read


Copyright © 2005-2011 eArticlesOnline, LLC - All Rights Reserved
Terms of Service | Privacy Policy